Shock up the world! 600 tons bridge-beam type carriage for 1100 KV transformer
2022-08-26
Our product 600 tons bridge-beam type carriage for 1100 KV transformer, it is 33m long ,12m wide and 18.5 high, the trip of the giant transformer of 607500KVA from Xinjing Changji to Changji development zone transforming station has done successfully by 6 days. The project is the highest level, biggest capacity, farthest distance power supply project, it is well-known as the top project on the world.
650 ton·m wind turbine blade loading test
2022-11-23
Our product self-rising and rotating wind turbine blade transportation vehicle for 650 ton·m blade is testing loading, the result is very good. It is the best special vehicle for the giant blade transportation.
Supper lower hydraulic platform vehicle road test
2022-11-23
In the recent days, our product 12 axles supper lower hydraulic platform vehicle for CGN road test as shown. The test is accepted by the user fully. The product is for nuclear waste transportation.
100 Tons Tower Tube Clamp-transportation Loading Site
2023-12-01
Recently, the 100 Tons Tower Tube Clamp-transportation equipment was delivered to work.
The equipment is used for the transportation of Tower Tube from 4.8m to 5.6m of diameter, 100 tons. of max load.
Recommend Read

Shock up the world! 600 tons bridge-beam type carriage for 1100 KV transformer
2022-08-26
Our product 600 tons bridge-beam type carriage for 1100 KV transformer, it is 33m long ,12m wide and 18.5 high, the trip of the giant transformer of 607500KVA f

650 ton·m wind turbine blade loading test
2022-11-23
Our product self-rising and rotating wind turbine blade transportation vehicle for 650 ton·m blade is testing loading, the result is very good. It is the

Supper lower hydraulic platform vehicle road test
2022-11-23
In the recent days, our product 12 axles supper lower hydraulic platform vehicle for CGN road test as shown. The test is accepted by the user fully. The product

100 Tons Tower Tube Clamp-transportation Loading Site
2023-12-01
Recently, the 100 Tons Tower Tube Clamp-transportation equipment was delivered to work.
The equipment is used for the transportation of Tower Tube from 4.8m t

Transport Trailer is an efficient cargo transportation solution
2023-11-30
In today's highly developed business environment, the demand for cargo transportation is increasing and the requirements are becoming higher and higher. Whe